LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2007 >> Compass Limited, AWD, Automatic CVT >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> Continuously Variable Transmission (CVT) (Service Information) >> Differential >> Disassembly >> Final Drive

Final Drive

Fig 1: PIN PUNCH AT ROLL PIN
GC0056670Courtesy of CHRYSLER LLC
  1. Remove the roll pin using a pin punch (1).
    Fig 2: PINION SHAFT ROLL PIN
    GC0056671Courtesy of CHRYSLER LLC
  2. Discard the old roll pin (3). See Fig 2.
    Fig 3: PINION SHAFT
    GC0056672Courtesy of CHRYSLER LLC
  3. Remove the pinion shaft (2) and inspect for excessive ware. See Fig 3.
    Fig 4: PINION GEAR SHIM
    GC0056673Courtesy of CHRYSLER LLC
  4. Roll the pinion gears (3) and shims (1) out of the carrier (2). See Fig 4.
  5. Remove the pinion gear shims (1) and mark for installation.
    Fig 5: PINION GEARS
    GC0056674Courtesy of CHRYSLER LLC
  6. Remove the pinion gears (1) from the carrier (3). See Fig 5.
    Fig 6: SIDE GEARS
    GC0056675Courtesy of CHRYSLER LLC
  7. Remove the side gears (2) and shims (3) from the carrier. See Fig 6.
    Fig 7: REMOVE SMALL BEARING
    GC0056676Courtesy of CHRYSLER LLC
  8. If the vehicle is a two wheel drive remove the carrier bearings using Puller C-293 PA, six Inserts C-293-40 and Press Insert C-4996.
    Fig 8: REMOVE LARGE BEARING
    GC0056677Courtesy of CHRYSLER LLC
  9. If all wheel drive use Puller C-293 PA, six 9613 Inserts and Insert 8888 to remove the carrier bearings.