LEMON Manuals: Even more car manuals for everyone
Home >> Jeep >> 2005 >> Grand Cherokee Limited, 5.7 2 >> Repair and Diagnosis >> Engine Performance >> System >> DTCS P0121 To P0171 >> Diagnosis And Testing >> P0161-O2 Sensor 2/2 Heater Performance >> Diagnostic Test

Diagnostic Test

  1. 1)  O2 SENSOR HEATER OPERATION 

    Turn the ignition off.

    NOTE: Wait a minimum of 8 minutes to allow the O2 Sensor to cool down before continuing the test. Allow the O2 Sensor voltage to stabilize between 4.6 and 5.0 volts.

    Ignition on, engine not running.

    With a scan tool, actuate the O2 Heater Test.

    With a scan tool, monitor 2/2 O2 Sensor voltage for at least 2 minutes.

    Does the voltage stay above 4.5 volts? 

    Yes 

    1. Go To step  2).

    No 

    1. Refer to INTERMITTENT CONDITION .
    2. Perform POWERTRAIN VERIFICATION TEST .
  2. 2)  O2 SENSOR HEATER ELEMENT 

    Turn the ignition off.

    NOTE: Allow the O2 sensor to cool down to room temperature.

    Disconnect the O2 Sensor harness connector.

    Measure the resistance of the 2/2 O2 Heater Element, between the O2 Heater Control terminal and the O2 Heater ground terminal in the O2 Sensor connector.

    NOTE: O2 Heater Element resistance values should be measured at 70°F (21.1°C). The resistance value will vary with different temperature values.

    Is the resistance of the O2 Sensor Heater Element between 2.0 and 30.0 ohms? 

    Yes 

    1. Go To step  3).

    No 

    1. Replace the O2 Sensor.
    2. Perform POWERTRAIN VERIFICATION TEST .
  3. 3)  (K399) O2 2/2 HEATER CONTROL CIRCUIT OPEN 
    Fig 1: Checking O2 Sensor Heater Control Circuit
    GC0027022Courtesy of DAIMLERCHRYSLER CORP.

    Disconnect the C3 PCM harness connector.

    CAUTION: Do not probe the PCM harness connectors. Probing the PCM harness connectors will damage the PCM terminals resulting in poor terminal to pin connection. Install Miller Special Tool #8815 to perform diagnosis.

    Measure the resistance of the (K399) O2 2/2 Heater Control circuit from the O2 harness connector to the appropriate terminal of special tool #8815.

    Is the resistance below 0.5 of an ohm? 

    Yes 

    1. Go To step  4).

    No 

    1. Repair the excessive resistance in the (K399) O2 2/2 Heater Control circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .
  4. 4)  (Z42) O2 2/2 HEATER GROUND CIRCUIT OPEN 
    Fig 2: Checking O2 Sensor Heater Ground Circuit
    GC0027023Courtesy of DAIMLERCHRYSLER CORP.

    Measure the resistance between ground and the (Z42) O2 2/2 Heater ground circuit in the O2 Sensor harness connector.

    Is the resistance below 0.5 of an ohm? 

    Yes 

    1. Go To step  5).

    No 

    1. Repair the excessive resistance in the (Z42) O2 2/2 Heater ground circuit.
    2. Perform POWERTRAIN VERIFICATION TEST .
  5. 5)  PCM 
    NOTE: Before continuing, check the PCM harness connector terminals for corrosion, damage, or terminal push out. Repair as necessary.

    Using the schematics as a guide, inspect the wire harness and connectors. Pay particular attention to all Power and Ground circuits.

    Were there any problems found? 

    Yes 

    1. Repair as necessary.
    2. Perform POWERTRAIN VERIFICATION TEST .

    No 

    1. Replace and program the Powertrain Control Module per Service Information.
    2. Perform POWERTRAIN VERIFICATION TEST .