Switch Down Test
- Connect jumper wire between Red terminal lead and Down terminal. Connect another jumper wire between ground terminal of switch and Up terminal. See Fig 1 .
- If motor operates, voltage is reaching motor. Install switch body back on multiple connector and actuate switch. If motor does not operate, replace switch body. Test each switch in same manner. If motor does not operate after installing new switch, go to MOTOR TEST .