LEMON Manuals: Even more car manuals for everyone
Home >> Jaguar >> 2009 >> XJR >> Repair and Diagnosis >> External Pages >> Different car >> Section 91 (Instrument Panel And Console) >> Removal and Installation >> Climate Control Assembly Housing >> Installation

Climate Control Assembly Housing: Installation

WARNING: This page does not describe the selected car, but rather 6 other vehicles, including the 2003 Jaguar XJR, 2003 Jaguar XJ8, 2003 Jaguar XJ, 2002 Jaguar XJR, and 2002 Jaguar XJ8. However, it is still accessible from the selected car via links, so may be relevant.
  1. Fit air conditioning panel to console.
  2. Position air conditioning panel and console at center console and connect multiplugs.
  3. Fully seat air conditioning panel and console on body bracket and fit and tighten securing screw.
  4. Fit radio and console. Refer to AUDIO UNIT HOUSING  .
  5. Fit center console veneer panel. Refer to FLOOR CONSOLE FINISH PANEL  .
  6. Fit 'J' gate retaining plate. Refer to FLOOR CONSOLE FINISH PANEL BRACKET  .
  7. Fit 'J' gate finisher. SELECTOR LEVER GATE FINISH PANEL for XJR or SELECTOR LEVER GATE FINISH PANEL for XJ8.
  8. Connect ground cable to battery terminal and fit battery cover. Refer to BATTERY CONNECT .
  9. Return 'J' gate selector to position 'P'.