Automatic Transmission (Aw30-40LE): Solenoid: Inspection: Notes
- Resistance check
- Using an ohmmeter, check the resistance between each terminals (S1/S2/SL) and body.
- Solenoid S1, S2 and lock-up solenoid SL resistance: 11 - 15 Ω (at 20°C) (Reference) 12 - 16 Ω (at 40°C)
- Using an ohmmeter, check the resistance between each terminals (STH) and (STHG).
- Pressure control solenoid resistance: 5 - 5.6 Ω (at 20°C) (Reference) 5.4 - 6.1 Ω (at 40°C)
NOTE: If the pressure control solenoid resistance is not within specification, replace the valve body assembly. - Using an ohmmeter, check the resistance between each terminals (S1/S2/SL) and body.
- Operation check
Check the solenoid operation by blowing into an oil hole as shown in Figure and Figure .