LEMON Manuals: Even more car manuals for everyone
Home >> Isuzu >> 2002 >> Rodeo S, 2.2 D, Automatic >> Repair and Diagnosis (Single Page) >> Heating, Ventilation & A/C (HVAC) >> HVAC Control Systems >> HVAC Systems >> Compressor Assembly >> Installation

Compressor Assembly: Installation

  1. Install compressor.
    • Tighten the compressor fixing bolts to the specified torque.

      Torque:  19 N.m (14 lb ft)

  2. Connect refrigerant line connector.
    • Tighten the refrigerant line connector fixing bolts to the specified torque.

      Torque:  15 N.m (11 lb ft)

    • O-rings cannot be reused. Always replace with new ones.
    • Be sure to apply new compressor oil to the O-rings when connecting refrigerant lines.
  3. Install serpentine belt.
    • Move serpentine belt tensioner to loose side using wrench, then install serpentine belt to normal position.
  4. Connect magnetic clutch harness connector.


  1. Install compressor.
    • Tighten the compressor fixing bolts to the specified torque. Torque:  19 N.m (14 lb ft)
  2. Connect refrigerant line connector.
    • Tighten the refrigerant line connector fixing bolts to the specified torque. Torque:  15 N.m (11 lb ft)
    • O-rings cannot be reused. Always replace with new ones.
    • Be sure to apply new compressor oil to the O-rings when connecting refrigerant lines.
  3. Install serpentine belt.
    • Move serpentine belt tensioner to loose side using wrench, then install serpentine belt to normal position.
  4. Connect magnetic clutch harness connector.