Engine Assembly: Remove, Install, and Overhaul
WARNING: This page is about the Pickup Base, 1.9 A, 4WD, MSG4ET, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters.
Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| 4WD,In-Line4,1.9L Eng,Standard Trans,Gas | Includes: R&I Transmission Assembly. | 24.8 | A | |
| Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul: | ||||
| Where Air Cond interferes add | 0.4 | A | ||
| Where Pwr Strg interferes add | 0.3 | A | ||