LEMON Manuals: Even more car manuals for everyone
Home >> International >> 1974 >> Scout II 4.2L Eng, 4WD, Automatic Trans >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line6,Automatic Trans,Gas, w/E.C.S.25.5A
In-Line6,Automatic Trans,Gas, w/o E.C.S.23.9A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
Where Air Cond interferes add0.6A
Where Air Pump interferes add0.9A
Where Power Steering interferes add0.3A