Component Inspection
- CHECK REMOTE ENGINE START RELAY
- Apply voltage of 12 V between the remote engine start relay. connector terminals 1 and 2.CAUTION:
- Never cause shorting between terminals.
- Connect the fuse between the terminals when applying the voltage.
- Check continuity between the remote engine start relay connector terminals 3 and 5.
Remote engine start relay
Condition
Continuity
Terminal
3 - 5
Apply voltage between terminals 1 and 2.
Existed
Do not apply voltage between terminals 1 and 2.
Not existed
Is the inspection result normal?
YES
INSPECTION END
NO
Replace remote engine start relay. Refer to COMPONENT LOCATION .
- Apply voltage of 12 V between the remote engine start relay. connector terminals 1 and 2.