Removal and Installation: Installation
Note the following, and install in the reverse order of removal:
- Perform inspection after installation. Refer to "INSPECTION ".
- After refilling new transfer fluid, perform learning of transfer fluid viscosity. Refer to "WORK PROCEDURE ".