LEMON Manuals: Even more car manuals for everyone
Home >> Infiniti >> 2012 >> G37 Base, 2D Convertible >> Repair and Diagnosis >> External Pages >> Different car >> Section 283 (Engine Control System - Introduction) >> Basic Inspection >> Inspection And Adjustment >> Ignition Timing >> IGNITION TIMING: Special Repair Requirement

IGNITION TIMING: Special Repair Requirement

WARNING: This page is about a different car, the 2012 Infiniti G25. However, it is still accessible from the selected car via links, so may be relevant.
  1. CHECK IGNITION TIMING
    1. Attach timing light to loop wire as shown in the figure.
      Fig 1: Inspecting Ignition Timing
      G08451268Courtesy of NISSAN NORTH AMERICA, INC.
    2. Check ignition timing.

    INSPECTION END