Inspection Procedure
- CHECK APPEARANCE
- Visually check that the exterior parts (e.g. suspension spring) have no malfunctions.
- Visually check tube and pipe for crush or oil leakage.
Is the check result normal?
YES: GO TO 2.
NO: Repair or replace damaged parts.
- CHECK CLOGGING OF ORIFICE IN PPMU
- Install an oil pressure gauge (SST: KV40108000) (A) to oil injection jack.CAUTION:
- Clean surrounding areas of oil injection jack using steam before starting operation, since there may be mud on it.
- Clean oil pressure gauge (special service tool: KV40108000) jack with steam before use.
- Jack must be securely inserted until a click sound can be heard.
- Pressure reducing valve (B) of the oil pressure gauge must be closed.
- Loosen needle valves A and C of PPMU by approximately 2 rotations for check changes in vehicle height.CAUTION: Never loosen the needle valve more than required.
- Tighten needle valve A and C of PPMU to the specified torque after the inspection.
Tightening torque : 8.3 N.m (0.85 kg-m, 73 in-lb)
Does the vehicle height change 10 mm (0.39 in) or more?
YES: For detailed inspection of clogging of orifice in PPMU, refer to "WORK PROCEDURE ".
NO: INSPECTION END
- Install an oil pressure gauge (SST: KV40108000) (A) to oil injection jack.