Diagnostic Procedure
- CHECK PNP SW CIRCUIT
With CONSULT-II
- Turn ignition switch ON.
- Select "SELECTION FROM MENU" in "DATA MONITOR" mode for "A/T" with CONSULT-II.
- Check if correct selector lever position (N/P, R or D) is displayed as selector lever is moved into each position.CONSULT-II REFERENCE CHART
Item name Condition Display value SLCT LVR POSI Selector lever in "N", "P" positions. N/P Selector lever in "R" position. R Selector lever in "D" position. D
OK or NG
OK: GO TO 5.
NG: GO TO 2.
- CHECK TCM POWER SUPPLY AND GROUND CIRCUIT
Check TCM power supply and ground circuit. Refer to "MAIN POWER SUPPLY AND GROUND CIRCUIT ".
OK or NG
OK: GO TO 3.
NG: Repair or replace damaged parts.
- DETECT MALFUNCTIONING ITEM
Check the following.
- A/T assembly harness connector pin terminals for damage or loose connection with harness connector.
OK or NG
OK: GO TO 4.
NG: Repair or replace damaged parts.
- CHECK SUB-HARNESS
- Remove control valve with TCM. Refer to "CONTROL VALVE WITH TCM AND A/T FLUID TEMPERATURE SENSOR 2 ".
- Disconnect park/neutral position switch connector and TCM connector.
- Check continuity between park/neutral position switch connector terminals and TCM connector terminals.CONTINUITY CHART
Item Connector Terminal Continuity Park/neutral position switch connector F505 1 Yes TCM connector F503 13 Park/neutral position switch connector F505 2 Yes TCM connector F503 11 Park/neutral position switch connector F505 3 Yes TCM connector F503 12 Park/neutral position switch connector F505 5 Yes TCM connector F503 14 - If OK, check harness for short to ground and short to power.
- Reinstall any part removed.
OK or NG
OK: Replace the control valve with TCM. Refer to "CONTROL VALVE WITH TCM AND A/T FLUID TEMPERATURE SENSOR 2 ".
NG: Replace open circuit or short to ground and short to power in harness or connectors.
- CHECK DTC
Perform "DTC Confirmation Procedure". Refer to "DTC CONFIRMATION PROCEDURE ".
OK or NG
OK: INSPECTION END
NG: GO TO 2.