LEMON Manuals
: Even more car manuals for everyone
Home
>>
Infiniti
>>
2004
>>
I35
>>
Repair and Diagnosis
>>
Transmission
>>
Automatic Trans
>>
Automatic Transaxle
>>
On-Vehicle Service
>>
Control Valve Assembly and Accumulators
>>
Installation
Control Valve Assembly and Accumulators: Installation
Set manual shaft in Neutral, then align manual plate with groove in manual valve.
After installing control valve assembly, make sure that selector lever can be moved to all positions.
Fig 1: Aligning Manual Plate With Groove In Manual Valve By Setting Manual Shaft In Neutral
Courtesy of NISSAN MOTOR CO., U.S.A.