  1. Turn companion flange in both directions 20 times or more to set bearing rollers, then check total preload with special service tool.
    1. Tool number : ST3127S000 (J-25765-A) 
    2. Total preload : 1.56 - 2.65 N.m 
    3. (0.16 - 0.27 kg-m, 14 - 23 in-lb) 
      Fig 1: Checking Total Preload With Special Service Tool
      G00725045Courtesy of NISSAN MOTOR CO., U.S.A.
    • If the preload value is out of standard, adjust by changing side bearing adjusting shim thickness (side retainer side).
      • If preload value too large, increase the side bearing adjusting shim thickness.