ASCD Main Switch
Disconnect harness connector, and remove switch. See Figure . Using ohmmeter, check continuity between indicated switch terminals, with switch in appropriate position. See ASCD MAIN SWITCH TEST table. See Fig 1 .
ASCD MAIN SWITCH TEST
| Switch Position | Continuity Between Terminals No. | ||||
|---|---|---|---|---|---|
| On | (1) 1, 2, 3 & 4 | ||||
| N (Neutral) | (1) 2, 3 & 4; (2) 5 & 6 | ||||
| Off | None | ||||
|
|||||