LEMON Manuals: Even more car manuals for everyone
Home >> Hyundai >> 2017 >> Azera Base >> Repair and Diagnosis >> Drivelines & Axles >> Axle Shafts >> Driveshaft Assembly >> TJ Joint >> Repair Procedures >> Installation

Repair Procedures: Installation

  1. Wrap tape around the driveshaft spline (TJ) to prevent damage to the boot.
  2. Using the alignment marks (D) made during disassembly as a guide, install the spider assembly (A) and snap ring (B) on the driveshaft splines (C).
    Fig 1: Installing Spider Assembly And Snap Ring On Driveshaft Splines (1 Of 2)
    G12089269Courtesy of HYUNDAI MOTOR AMERICA
    Fig 2: Installing Spider Assembly And Snap Ring On Driveshaft Splines (2 Of 2)
    G12089270Courtesy of HYUNDAI MOTOR AMERICA
  3. Add specified grease to the joint boot as much as it was wiped away at inspection.
  4. Install the both boot band.
  5. To control the air in the TJ boot, keep the specified distance between the boot bands when they are tightened.
    Engine/TM Distance (L) mm(in.)
    LH side RH side
    RAMDA 3.0 MPI A/T 518.7 (20.4212) 849.3 (33.4369)
    RAMDA 3.3 GDI A/T
    Fig 3: Checking Distance Between Boot Bands
    G12089271Courtesy of HYUNDAI MOTOR AMERICA
  6. Using the SST (09495-3K000), secure the TJ boot bands.

    Clearance (A)  : 2.0 mm (0.0787 in) or less

    Fig 4: Securing TJ Boot Bands
    G12089272Courtesy of HYUNDAI MOTOR AMERICA
  7. Install the Front Driveshaft.

    (Refer to Driveshaft Assembly - "Front Driveshaft ")