LEMON Manuals: Even more car manuals for everyone
Home >> Hyundai >> 2016 >> Tucson Eco, FWD >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> Dual Clutch Transmission Control System - 1.6L >> Shift Cable >> Repair Procedures >> Installation

Repair Procedures: Installation

  1. Install the retainer and then tighten the nut (A).

    Tightening Torque: 

    8.8 ~ 13.7 N.m (0.9 ~ 1.4 kgf.m, 6.5 ~ 10.1 lb-ft)

    Fig 1: Installing Retainer
    G11675971Courtesy of HYUNDAI MOTOR AMERICA
  2. Install the shift cable (A) and then fix the snap pin (B).
    NOTE:
    • Install the cable after placing the shift lever and the Manual Control Lever in the N position.
    Fig 2: Placing Shift Lever And Manual Control Lever N Position
    G11675972Courtesy of HYUNDAI MOTOR AMERICA
  3. Align the hole (A) in the Manual Control Lever with the "N" position hole (B) of the inhibitor switch and then insert the inhibitor switch guide pin (SST No:09480-A3800).
    Fig 3: Aligning Hole Manual Control Lever With Position Hole
    G11675973Courtesy of HYUNDAI MOTOR AMERICA
  4. Connect the shift cable (C) into cable bracket (A).
  5. Lightly tighten the nut (B) after connected the shift cable (C) in the Manual Control Lever (D).
  6. Push shift cable (C) lightly to "F" direction displayed to eliminate free play of shift cable.
  7. Tighten the nut (B) to the specified torque.

    Tightening Torque: 

    9.8 ~ 14.7 N.m (1.0 ~ 1.5 kgf.m, 7.2 ~ 10.8 lb-ft)

    Fig 4: Connecting Shift Cable Into Cable Bracket
    G11675974Courtesy of HYUNDAI MOTOR AMERICA
  8. Install the battery and tray.

    (Proceed to Engine Electrical System - "BATTERY ")

  9. Install the TCM.

    (Proceed to Dual Clutch Transmission Control System - "TCM ")

  10. Install the air cleaner assembly and air duct.

    (Proceed to Engine Mechanical System - "AIR CLEANER 1.6L ")

    CAUTION: Check that operating surely at each range of the inhibitor switch corresponding to each position of shift lever.