Water Temperature Control Assembly
NOTE:
Clean the contact face before assembly.
- Install the water temperature control assembly (B) and a new gasket (A).
Tightening torque
18.62 ~ 23.52Nm (1.9 ~ 2.4kgf.m, 13.74 ~ 17.36lb-ft)
NOTE: Use new O-rings (C) when reassembling. - Connect water hoses to the water temperature control assembly.
- Install the wiring protector.
- Connect the ECT sensor connector.
- Connect the radiator upper and lower hose (A).
- Install the air cleaner assembly.
- Fill with engine coolant.
- Start engine and check for leaks.
- Recheck engine coolant level.