LEMON Manuals: Even more car manuals for everyone
Home >> Hyundai >> 2011 >> Elantra Touring GLS, Automatic >> Repair and Diagnosis >> Engine Mechanical >> Intake And Exhaust System >> Intake Manifold >> Removal And Installation

Removal And Installation

  1. Removal the engine cover.
  2. Disconnect the throttle position sensor (TPS) and the idle speed actuator (ISA) connectors.
  3. Disconnect the positive crankcase ventilation (PCV) hose and the breather hose.
  4. Disconnect the accelerator cable.
  5. Remove the delivery pipe (A).

    Tightening torque 

    18.6 ~ 23.5 Nm (1.9 ~ 2.4 kgf.m, 13.7 ~ 17.3 lb-ft)

    Fig 1: Locating Delivery Pipe
    G06135911Courtesy of HYUNDAI MOTOR CO.
  6. Disconnect the purge control solenoid valve (PCSV) hose and the brake booster hose from the intake manifold and throttle body assembly.
  7. Remove the intake manifold stay (A).

    Tightening torque 

    17.7 ~ 24.5 Nm (1.8 ~ 2.5 kgf.m, 13.0 ~ 18.1 lb-ft)

    Fig 2: Locating Intake Manifold Stay
    G05363587Courtesy of HYUNDAI MOTOR CO.
  8. Remove the intake manifold assembly (A).

    Tightening torque 

    15.7 ~ 22.6 Nm (1.6 ~ 2.3 kgf.m, 11.6 ~ 16.6 lb-ft)

    Fig 3: Locating Intake Manifold Assembly
    G06135913Courtesy of HYUNDAI MOTOR CO.
  9. To install, reverse the removal procedure with new gaskets.