LEMON Manuals: Even more car manuals for everyone
Home >> Hyundai >> 2007 >> Azera GLS >> Repair and Diagnosis >> Steering >> Mechanical Power Steering System >> Power Steering Gear Box >> Installation

Power Steering Gear Box: Installation

NOTE: Be sure to connect between a tube and a hose as shown in the illustration.
Fig 1: Identifying Tube And Hose Connecting Dimension
G04802354Courtesy of HYUNDAI MOTOR CO.
  1. Installation is reverse of removal.

    TIGHTENING TORQUE Nm (kgf.m, lb-ft) 

    Pressure hose to gear box:

    12~18 (1.2~1.8, 8.6~13)

    Return tube to gear box:

    12~18 (1.2~1.8, 8.6~13)

    Tie rod end lock nut:

    50~55 (5~5.5, 36.1~39.7)

    Pinion and valve assembly to self locking nut:

    20~30 (2~3, 14.4~21.6)

    Lock nut:

    50~70 (5~7, 36.1~50.6)

    Tie rod end self locking nut:

    24~34 (2.4~3.4, 17.3~24.5)

    Mounting bracket to crossmember:

    60~80 (6~8, 43.3~57.8)

  2. After installation, bleed the air in the power steering system (See REPLACING POWER STEERING FLUID ).
  3. Check for front wheel alignment. (Refer to WHEEL ALIGNMENT ).