LEMON Manuals: Even more car manuals for everyone
Home >> Hummer >> 2010 >> H3T Base, Automatic >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Starter Replacement (LLR) >> Installation Procedure

Installation Procedure

    Fig 1: Starter Motor, Nut & Bolt
    GM1313646Courtesy of GENERAL MOTORS CORP.
  1. Position the starter motor (3) over the stud (2).
  2. CAUTION: Refer to Fastener Caution .
  3. Install the starter motor nut (1) and bolt (4).

    Tighten:  Tighten the bolt/nut to 50 N.m (37 lb ft).

  4. Fig 2: Starter Wiring
    GM1560047Courtesy of GENERAL MOTORS CORP.
  5. Connect the battery positive cable (2) to the starter and install the starter terminal nut (1).

    Tighten:  Tighten the nut to 9 N.m (80 lb in).

  6. Connect the lead to the starter solenoid and install the starter solenoid S terminal nut.

    Tighten:  Tighten the nut to 3.5 N.m (31 lb in).

  7. Install the intake manifold. Refer to Intake Manifold Replacement .