LEMON Manuals: Even more car manuals for everyone
Home >> Hummer >> 2008 >> H3 Base, Standard >> Repair and Diagnosis >> External Pages >> Different car >> Section 284 (Battery, Charging System And Starting System) >> Diagnostic Information and Procedures >> DTC B1390 >> Circuit/System Verification

Circuit/System Verification

WARNING: This page is about a different car, the 2009 GMC Canyon and 2009 Chevrolet Colorado. However, it is still accessible from the selected car via links, so may be relevant.
  1. Engine running, accessories OFF, measure and record the battery voltage at the battery terminals. The voltage should be between 12.6 and 15.0 volts.
  2. Observe the scan tool BCM Battery Voltage Signal parameter and the Batt. Voltage High Res. parameter. The readings for both parameters should be between 12.6 and 15.0 volts, and should be within 1.5 volts of each other.