DTC P062B: Inspection
+B_INJ, INJ_RLY_OUT, FI_MAIN_RLY_CL- Circuit Inspection
NOTICE:
Before disconnecting the PCM connector, jump the SCS line with the HDS, and wait more than 1 minute.
Test Procedure
- Preparation
- Injector relay: disconnected
- PCM connector B (72P): disconnected
- Procedure
- Perform the inspection according to the following chart.
| (Disconnected) Injector relay socket (5P) female terminals | (Disconnected) PCM connector B (72P) female terminals | ||||
| IG Mode |
|
|
Normal Conditions | ||
| +B_INJ circuit inspection 1 | OFF | 12 V battery voltage [circuit type 1] | |||
| +B_INJ circuit inspection 2 | OFF | 12 V battery voltage [circuit type 1] | |||
| INJ_RLY_OUT open wire inspection | OFF | There is less than 1 Ω | |||
| FI_MAIN_RLY_CL- open wire inspection | OFF | There is less than 1 Ω | |||
| INJ_RLY_OUT shorted to ground inspection | OFF | There is more than 1 MΩ | |||
Results
- If it is abnormal, there is a problem in the circuit.
If the power supply inspection of the above table showed abnormally, do the additional Power Supply Inspection , to locate the failure.
PCM Inspection
Test Procedure
- If the other inspection item(s) indicated a normal condition, then it is determined that the remaining PCM is the cause.
Results
- There is a problem with the PCM.