LEMON Manuals: Even more car manuals for everyone
Home >> Geo >> 1990 >> Tracker Base, Automatic >> Labor Times >> Engine Mechanical >> Mechanical >> Cylinder Head Gasket >> Remove & Replace

Cylinder Head Gasket: Remove & Replace

Includes: Remove carbon and check surfaces for warpage. Includes adjust Valves (where applicable) and clean and adjust Spark Plugs.

Applies ToNoteStandard HoursWarranty HoursSkill Level
w/Air Cond,16 Valve Eng7.9B
w/Air Cond,8 Valve Eng7.5B
w/o Air Cond,16 Valve Eng6.9B
w/o Air Cond,8 Valve Eng6.5B
Combination Procedure: CYLINDER HEAD: Disassemble & Assemble:
D&A for Sublet machine operations. Use Necessary Clock Time.B