Grind Complete
WARNING: This page is about the Sierra 2500 HD AT4, 6.6L Eng VIN 7, which is a different variant/trim than selected.
Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).| Applies To | Note | Standard Hours | Warranty Hours | Skill Level |
|---|---|---|---|---|
| Gas, w/Dual Alternators | Includes: R&I Fender Liners. Includes: R&I Oil Level Indicator Tube. Includes: R&I Exhaust Manifolds. Includes: R&I Air Cleaner. Includes: R&I Alternator. Includes: R&I Intake Manifold. Includes: R&I Valve Covers. Includes: Drain and refill Cooling System. Includes: Replace Oil and Filter. Includes: Reset Oil Life Monitor. | 17.9 | A | |
| Gas, w/Single Alternator | Includes: R&I Fender Liners. Includes: R&I Oil Level Indicator Tube. Includes: R&I Exhaust Manifolds. Includes: R&I Air Cleaner. Includes: R&I Alternator. Includes: R&I Intake Manifold. Includes: R&I Valve Covers. Includes: Drain and refill Cooling System. Includes: Replace Oil and Filter. Includes: Reset Oil Life Monitor. | 17.7 | A | |
| Combination Procedure: THROTTLE BODY ASSEMBLY: Reset: | ||||
| Gas, Throttle Body Idle Air Flow Compensation Reset | Includes: Additional time for use of scan tool to perform this procedure. | 0.2 | B | |
| Combination Procedure: VALVE LIFTERS: Remove & Replace: | ||||
| All | 0.5 | B | ||
| Combination Procedure: VALVE LIFTERS (REMOVED): Clean: | ||||
| Each Additional | 0.1 | B | ||
| One | 0.2 | B | ||