LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2019 >> Sierra 2500 HD Base, 2D Pickup, Gas >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Sierra 2500 HD Base, 4D Pickup Crew Cab, 6.0L Eng VIN B, 4WD, Gas/Ethanol, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
Gas/Ethanol, w/Engine Oil CoolerIncludes: R&I Radiator. Includes: R&I Air Conditioning Condenser; recover, evacuate and recharge Air Conditioning System.38.2A
Gas/Ethanol, w/o Engine Oil CoolerIncludes: R&I Radiator. Includes: R&I Air Conditioning Condenser; recover, evacuate and recharge Air Conditioning System.38.0A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
w/Skid Plate add0.3A
Combination Procedure: CAMSHAFT BEARING: Remove & Replace:
Each0.3A
Combination Procedure: OIL PUMP: Overhaul:
0.6B