Installation Procedure
Fuse Block (1) - Install
When installing the battery positive cable clamp to the battery positive post, make sure the clamp is seated correctly on the post.
- CAUTION:
Refer to Fastener Caution .
Battery Positive Post Clamp Nut (1) - Install and tighten 9 N.m (80 lb in)
Battery Positive Junction Block Cable Nut (3) - Install and tighten 16 N.m (12 lb ft)
- Positive Battery Cable Terminal Nut-Large (2) - Install and tighten 16 N.m (12 lb ft)
- Positive Battery Cable Terminal Nut-Small (1) - Install and tighten (Qty: 2) 9 N.m (80 lb in)
Body Wiring Harness Terminal Nut (2) - Install and tighten (Qty: 4) 9 N.m (80 lb in)
- Body Wiring Harness Connector (1) - Connect
Battery Fuse Block Cover (1) - Install
- Connect the battery negative cable. - Connect - Battery Negative Cable Disconnection and Connection (Without KL9)Battery Negative Cable Disconnection and Connection (With KL9)