LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2017 >> Yukon Denali, RWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions >> Generator Battery Control Wiring Harness Replacement (L96) >> Installation Procedure

Installation Procedure

    Fig 1: Generator Battery Control Wiring Harness Cable
    GM3627104Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

  1. Install the generator battery control wiring harness cable (1) to the starter solenoid (3) and tighten the fastener (2) to 9 N.m (80 lb in).
  2. Fig 2: Generator Battery Control Wiring Harness Cable
    GM3630784Courtesy of GENERAL MOTORS COMPANY
  3. Connect the generator battery control wiring harness cable (3) to the generator (4) and tighten the fastener (2) to 15 N.m (11 lb ft).
  4. Install the protective boot (1) over the B + generator stud.
  5. Fig 3: Generator Battery Control Wiring Cable
    GM3627105Courtesy of GENERAL MOTORS COMPANY
  6. Install the generator battery control wiring harness cable (3), to the battery fuse block (4), and tighten the fastener (2) to 9 N.m (80 lb in).
  7. Install the generator battery control wiring harness cable (5) and the battery positive cable (6) to the battery fuse block (4). Tighten the fastener (7) to 9 N.m (80 lb in).
  8. Install the battery fuse block cover (1).
  9. Install the upper intake manifold sight shield. Refer to Upper Intake Manifold Sight Shield Replacement .
  10. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Dual Battery) Battery Negative Cable Disconnection and Connection (Single Battery) .