LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 2012 >> Canyon 4D Pickup, 2.9L Eng VIN 9 >> Repair and Diagnosis >> Engine Performance >> Engine Control Systems >> Engine Controls/Fuel - 2.9L - Repair Instructions >> Repair Instructions >> Knock Sensor Replacement >> Installation Procedure

Installation Procedure

    Fig 1: View Of KS Engine Wiring Harness Connector
    GM1352023Courtesy of GENERAL MOTORS COMPANY
    CAUTION:

    Refer to Fastener Caution .

  1. Install the KS (1) and the retaining bolt to the engine block, positioning the electrical terminals rearward.

    Tighten 

    Tighten the KS bolt to 25 N.m (18 lb ft).

  2. Connect the engine wiring harness electrical connector (3) to the KS (1).
  3. Install the left wheelhouse liner. Refer to Front Wheelhouse Liner Replacement .
  4. Lower the vehicle.