Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Install the interface control module to the PCM cover.
- Connect the interface control module electrical connector.
- Install the electrical connector.
- Slide the gray lever rearward completely until it locks.
- Connect the battery service disconnect/connect. Refer to Hybrid Battery Service Disconnect/Connect (5.3L Engine w/RPO HP2) .
- Program the interface control module. Refer to Control Module References for programming and setup information.