Installation Procedure
WARNING: This page is about a different variant/trim than selected.
- Connect the control module electrical connectors.
- Install the control module.NOTE: Refer to Fastener Notice .
- Install the control module nuts.
Tighten: Tighten the nuts to 6 N.m (53 lb in).
- Install the battery cover. Refer to Battery Cover Replacement (5.3L Engine w/RPO HP2) .
- Program the energy storage control module. Refer to Control Module References for programming and setup information.