Installation Procedure
- Install the generator cable (2) to the junction block.
- Install the generator cable nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Close the positive cable junction block.
- Install the generator cable to the generator, perform the following:
- Install the generator cable to the stud.
- Install the generator cable nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Position the boot to cover the stud.
- If necessary, install the engine sight shield. Refer to Upper Intake Manifold Sight Shield Replacement (4.8L, 5.3L, and 6.0L - RPO LQ4) or Upper Intake Manifold Sight Shield Replacement (6.0L - RPO LQ9) .
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (Auxiliary Battery) or Battery Negative Cable Disconnection and Connection (Single Battery) .
NOTE:
Refer to Fastener Notice
.