Installation Procedure
- Install the battery vent hose to the battery, if required.
- Install the battery (1) into the battery box.
- Install the battery hold down (3).NOTE: Refer to Fastener Notice .
- Install the battery hold down bolt (2).
Tighten: Tighten the bolt to 25 N.m (18 lb ft).
- Install the battery vent hose grommet (1) to the battery box.
- Position the positive battery cable, and Install the cable terminal to the battery positive terminal.
- Tighten the positive battery cable terminal nut.
Tighten: Tighten the nut to 9 N.m (80 lb in).
- Close the positive battery cable cover (2).
- Connect the body wiring harness electrical connector (2) to the positive battery cable electrical connector (3).
- Connect the body wiring harness electrical connector (4) to the negative battery cable electrical connector (1).
- Connect the body wiring harness electrical connector (3) to the battery current sensor (2).
- Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .
Fig 6: Identifying Body Wiring Harness Electrical Connector And Negative Battery Cable Electrical Connector