Cleaning Procedure
- Remove EVAP canister. See EVAP CANISTER . Turn main valve to OFF position on EVAP Pressure/Purge Diagnostic Station. Disconnect hose from EVAP Pressure/Purge Diagnostic Station pressure regulator. Using a section of vacuum hose, connect one end to EVAP Pressure/Purge Diagnostic Station pressure regulator. Connect other end of vacuum hose to EVAP canister side of purge pipe.
- Turn main nitrogen cylinder valve to ON position and continue to discharge nitrogen for 15 seconds. If the nitrogen does not dislodge the carbon particles, replace the purge pipe. Replace EVAP canister. Continue with DTC test.