Installation Procedure
- Install the PTO switch to the housing
- Connect the wire connector to the switch.
- Install the switch housing to the I/P till it clicks into place.
- Install the I/P cluster bezel. Refer to BEZEL REPLACEMENT - INSTRUMENT PANEL (I/P) CLUSTER .