LEMON Manuals: Even more car manuals for everyone
Home >> GMC >> 1993 >> Forward Control 4.3 Z, Automatic >> Repair and Diagnosis >> External Pages >> Different car >> Section 61 (Engine Controls - Remove/Install/Overhaul - 5.9L Diesel) >> Air Induction System >> Turbocharger Assembly >> Installation

Turbocharger Assembly: Installation

WARNING: This page is about a different car, the 1995 Dodge Pickup and 1995 Dodge Cab & Chassis. However, it is still accessible from the selected car via links, so may be relevant.
  1. To install, reverse removal procedure using NEW gaskets. Apply anti-seize compound on turbocharger mounting studs. Install turbocharger and retaining nuts.
  2. Install oil drain tube on turbocharger. Before installing oil supply line, pour 3 ozs. (60 cc) of clean engine oil in oil inlet while spinning turbocharger. Tighten bolts/nuts to specification. See TORQUE SPECIFICATIONS .