Upper Intake Manifold: Installation
WARNING: This page is about a different variant/trim than selected.
- 1.
Using a new gasket, install the upper intake manifold and the 7 bolts.- Tighten in the sequence shown in 2 stages.
- Stage 1: Tighten to 10 Nm (89 lb-in).
- Stage 2: Tighten an additional 45 degrees.
- Tighten in the sequence shown in 2 stages.
- 4.
Connect the power brake booster vacuum supply hose and crankcase ventilation hose to the upper intake manifold.
- 5.
Connect the EVAP vapor tube to the EVAP canister vent solenoid. For additional information, refer to Fuel System General Information .- Attach the EVAP vapor tube to the 2 retainers.
- 6.
Connect the MAPT electrical connector.- Attach the wiring harness pin-type retainer to the upper intake manifold.
- 7.
Connect the EVAP canister vent solenoid and throttle body electrical connectors.- Attach the wiring harness pin-type retainer to the upper intake manifold.
- 8.
Install the ACL outlet pipe. For additional information, refer to Intake Air Distribution and Filtering .