Smart Junction Box (SJB): Installation
WARNING: This page is about a different car, the 2010 Ford Mustang. However, it is still accessible from the selected car via links, so may be relevant.
- Position the SJB
and install the nut.
- Tighten the nut to 6 Nm (53 lb-in).
- Connect the 7 SJB electrical connectors.
- Install the RH A-pillar lower trim panel.
- Download the SJB configuration information from the scan tool to the SJB . For additional information, refer to MODULE CONFIGURATION .
- Train the tire pressure sensors. For additional information, refer to WHEELS & TIRES .
- Carry out the SJB self-test (must include an on-demand self-test) and then repeat the self-test to confirm all SJB DTCs have been cleared.
- Rotate the instrument panel dimmer switch from the full dim position to the dome ON position. This will ensure that all displays are visible under all lighting conditions.
NOTE:
It may be necessary to push the red lock tab upward after installing the B+ connector.
NOTE:
If the SJB
is not being replaced, this is the last step that is necessary.
NOTE:
When successful, this step provides the calibration necessary for the SJB
operation and clears DTCs B106D, B2477 and B2A21. The clearing of these DTCs indicates the calibration data has been successfully downloaded to the SJB
.
NOTE:
DTC B2276 may be set, indicating there are less than 2 transmitters programmed to the SJB
. For additional information, refer to
HANDLES, LOCKS, LATCHES AND ENTRY SYSTEMS
.
NOTE:
When successful, this step clears DTCs B2868, B2869, B2870 and B2871. The clearing of these DTCs indicates the SJB
has recognized the tire pressure sensors during the training procedure.
NOTE:
The SJB
DTC C2780 will not clear if any other DTCs are still present in the SJB
.
NOTE:
This step is required to clear the SJB
DTC C2780, allow the SJB
to exit the manufacturing mode, and to make sure there are no other concerns with the newly programmed SJB
.