Smart Junction Box (SJB): Installation
- Install the SJB
.
- Install the 2 bolts.
- Connect the 7 electrical connectors.
- Install the transmission selector lever bezel into the floor console finish panel.
- Install the floor console SJB cover.
- Train the tire pressure sensors. For additional information, refer to TIRES & WHEELS .
- Carry out the SJB self-test (must include an on-demand self-test) and then repeat the self-test to confirm all DTCs have been cleared.
- Rotate the instrument panel dimmer switch from the full dim position to the dome ON position. This makes sure that all displays are visible under all lighting conditions.
NOTE:
If the SJB
was not replaced, this is the last step that is necessary.
NOTE:
The RKE
transmitter portion of the Integrated Keyhead Transmitter (IKT) key is automatically transferred during Programmable Module Installation (PMI). Passive Anti-Theft System (PATS) programming is not necessary. If As-Built data is required during PMI
, all remote transmitters (IKT
or fob) must be programmed to the new SJB
. Cycling the ignition to run for 6 seconds with each IKT
programs the RKE function of the IKT
key. For additional information, refer to
HANDLES, LOCKS, LATCHES & KEYLESS ENTRY SYSTEM
article for the remote transmitter (fob only) programming instructions, if necessary.
NOTE:
DTC B2276 may be set, indicating there are less than 2 transmitters programmed to the SJB
. For additional information, refer to
HANDLES, LOCKS, LATCHES & KEYLESS ENTRY SYSTEM
article.
NOTE:
DTC C2780 does not clear if any other DTCs are present in the SJB
. When successful, this step clears DTC C2780.