Electronic Pressure Control (EPC) Solenoid: Installation

  1. Install the EPC solenoid.
    1. Install the EPC solenoid.
    2. Install the EPC solenoid bracket and bolt.
      Fig 1: Installing EPC Solenoid
      G03241594Courtesy of FORD MOTOR CO.
  2. Inspect the lead frame for damage.
    • Using the special tool, check all lead frame solenoid connections. The gauge should fit tightly and not fall out after being inserted.
    • If the special tool passes through any lead frame connector pins or does not feel like it makes a good contact, install a new lead frame.
      Fig 2: Inspecting Lead Frame
      G03241595Courtesy of FORD MOTOR CO.
  3. Connect the molded lead frame to the solenoids.
    • Connect the bulkhead inter-connector by pressing it in place by hand and fully seating the connector in place.
    • Connect the EPC solenoid by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.
    • Connect the TCC by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.
    • Connect the shift solenoid SSA and SSB by pressing it in place by hand and fully seating the connector in place. Make sure that the terminals pass fully through the connector slots.
    Fig 3: Connecting Molded Lead Frame To Solenoids
    G03241596Courtesy of FORD MOTOR CO.
  4. Install the manual control lever. For additional information, refer to MANUAL CONTROL LEVER SHAFT AND SEAL .