LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 2004 >> Freestar Base >> Repair and Diagnosis >> Body & Frame >> Windows >> Body Panel System - Exterior >> Description And Operation >> Power Sliding Door >> Initialization Procedure

Initialization Procedure

If the PSD loses the logic battery supply for any reason, such as battery disconnect, module disconnect or if left open for more than 6 hours, the PSD will lose the PSD position stored in memory. Disconnecting the battery will cause both PSDs to lose PSD position. Disconnecting the PSD connector will only cause the specific module to lose its memory. If only one PSD module is affected, the initialization procedure only needs to be carried out for the specific module.

The PSD normal operation will not be restored until the PSD position is once again stored into memory. The initialization procedure is the learning process the PSD uses to restore the PSD position in memory. The PSD monitors the position sensor data received during the initial power open-and-close operation to learn the positions.

Refer to POWER SLIDING DOOR INITIALIZATION .