LEMON Manuals: Even more car manuals for everyone
Home >> Ford >> 1998 >> RV Cutaway Custom, 7.3 F >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the RV Cutaway Custom, 5.4 L, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8,Gas33.1A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
V8,Gas, Where Air Cond interferes add1.4A
w/Frame Mounted Battery add0.20.2A
Combination Procedure: OIL PUMP: Overhaul:
V8,Gas0.4B