LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2021 >> 2500 HD Power Wagon >> Labor Times >> Other Variant >> Engine Mechanical >> Mechanical >> Engine Assembly >> Remove, Install, and Overhaul

Engine Assembly: Remove, Install, and Overhaul

WARNING: This page is about the 2500 HD Big Horn, 2D Pickup, 6.4L Eng VIN J, 4WD, which is a different variant/trim than selected.
Includes: Replace Rings, Main and Rod Bearings, Camshaft(s), Crankshaft and Timing Components. Remove Cylinder ridge, burnish Cylinders, grind Valves and clean and test or replace Lifters. Includes (where applicable): Adjust Valves. DOES NOT include Pin fit or rebore and align Rods. See machine operations.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8DOES NOT include Air Conditioning System recover, evacuate and recharge.41.2A
Additional Procedure: ENGINE ASSEMBLY: Remove, Install, and Overhaul:
Where Dual Generator interferes add0.5A
Where Winch interferes add1.5A