LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2019 >> ProMaster 2500 >> Repair and Diagnosis >> Transmission >> Transmission Control Systems >> Automatic Transmission (Service Information) >> Valve Body >> Installation

Valve Body: Installation

GC0122797Courtesy of CHRYSLER GROUP, LLC
  1. Install a NEW  2/4 clutch oil seal (1).
    GC0122514Courtesy of CHRYSLER GROUP, LLC
  2. Install NEW  O-rings (1) on the underdrive compounder assembly oil transfer tubes (2).
    GC0122513Courtesy of CHRYSLER GROUP, LLC
  3. Insure the manual lever is fully forward to keep the manual valve pin (3) from binding.
  4. Set the manual valve pin (3) into the slot in the rooster comb.
  5. Set the valve body into the underdrive compounder assembly oil transfer tubes (2) and press the valve body into place.
    GC0122789Courtesy of CHRYSLER GROUP, LLC
  6. Install the valve body to case bolts and tighten to 6 N.m (50 in. lbs.).
    GC0122788Courtesy of CHRYSLER GROUP, LLC
  7. Install the detent arm (1) onto the pin at the valve body.
  8. Install the screw (3) at the detent arm and tighten to 6 N.m (50 in. lbs.).
    GC0122511Courtesy of CHRYSLER GROUP, LLC
  9. Install the electrical connector (1) at the valve body.
    GC0122509Courtesy of CHRYSLER GROUP, LLC
  10. Install the valve body oil pan, use a bead of MOPAR® ATF RTV (MS-GF41).
  11. Install the valve body oil pan bolts and tighten to 12 N.m (9 ft. lbs.).
  12. Install the pressure tap at valve body oil pan and tighten to 6 N.m (50 in. lbs.).
    GC0122501Courtesy of CHRYSLER GROUP, LLC
  13. Install the solenoid pack connector (2) at valve body oil pan.
    GC0122509Courtesy of CHRYSLER GROUP, LLC
  14. Install the left side inner wheel splash shield screws (1).
    GC0122507Courtesy of CHRYSLER GROUP, LLC
  15. Install the Front Sound Damper Cover (2) and the fasteners (1).
  16. Lower the vehicle.
  17. Install the battery cable.
  18. Fill transmission and road test. Refer to FLUID, STANDARD PROCEDURE .