LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2018 >> ProMaster 2500 Van Cargo >> Repair and Diagnosis >> Engine Performance >> Fuel Delivery >> Fuel System >> Fuel Delivery, Diesel >> Valve, Cascade Overflow >> Installation

Valve, Cascade Overflow: Installation

GC0158060Courtesy of CHRYSLER GROUP, LLC
  1. Inspect the cascade overflow valve O-ring seals (1, 3).
    GC0161967Courtesy of CHRYSLER GROUP, LLC
  2. Install the cascade overflow valve (1) and tighten to 18 N.m (159 in. lbs.).
    GC0161813Courtesy of CHRYSLER GROUP, LLC
  3. Install the Charge Air Cooler (CAC) hose (2) to the EGR air flow control valve elbow and securely tighten clamp (1).
  4. Install the radiator crossmember. Refer to CROSSMEMBER, RADIATOR, INSTALLATION .