LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2018 >> Challenger SXT Plus >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 10 (6.2L Engine (Service Information)) >> Engine Mounting >> Insulator, Engine Mount, Front >> Installation

Insulator, Engine Mount, Front: Installation

WARNING: This page is about a different variant/trim than selected.
GC0144623Courtesy of CHRYSLER GROUP, LLC
  1. If removed, position the engine mount to engine block mounting brackets, install the retaining bolts and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
    GC0144622Courtesy of CHRYSLER GROUP, LLC
  2. Position the engine mounts (2), Install the retainers (1) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
    GC0144621Courtesy of CHRYSLER GROUP, LLC
  3. Position the generator support bracket (3) to the engine mount, install the retaining nut (1) and tighten finger tight.
  4. Position the generator support bracket to the generator, install the retaining bolt (2) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  5. Tighten the generator support bracket to engine mount retaining nut to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  6. Lower the vehicle.
    GC0170311Courtesy of CHRYSLER GROUP, LLC
  7. Lower the Engine Support Fixture (special tool #8534C, Fixture, Driveline Support) (3) until the engine mounts are seated in the engine cradle.
  8. Remove the Engine Lift Fixture (special tool #8984B, Fixture, Engine Lifting) (1), Engine Lift Adapter (special tool #8984-UPD, Adapter, Engine Lift) (2) and the Engine Support Fixture (special tool #8534C, Fixture, Driveline Support) (3).
  9. Install the Variable Valve Timing Solenoid (VVTS). Refer to SOLENOID, VARIABLE VALVE TIMING (VVTS), EXHAUST, INSTALLATION  .
  10. Raise and support the vehicle. Refer to HOISTING, STANDARD PROCEDURE .
    GC0144614Courtesy of CHRYSLER GROUP, LLC
    NOTE:

    Left side shown, right side similar.

  11. Install both left/right engine mount lower retaining bolts (2) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
  12. Position both left/right engine mount heat shields (4), install the retaining nuts (3) and tighten to the proper specification. Refer to TORQUE SPECIFICATIONS  .
    GC0095584Courtesy of CHRYSLER GROUP, LLC
  13. Position the belly pan and install the belly pan retainers (1).
  14. Lower the vehicle.
  15. Position the engine oil dipstick tube, install the retaining nut at the right exhaust manifold.
  16. Install the supercharger assembly. Refer to SUPERCHARGER, INSTALLATION .
  17. Connect the negative battery cable.