LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2012 >> Grand Caravan SE, Gas >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> Engine Cooling System >> Engine >> Fan, Cooling >> Installation >> Installation

Fan, Cooling: Installation: Installation

Fig 1: Cooling Fan, Module & Upper Radiator Hose
GC0147254Courtesy of CHRYSLER GROUP, LLC
  1. Position the radiator cooling fan (1) into mounts and attaching clips on the radiator. Press down to lock into place.
  2. Connect the cooling fan electrical connectors (2).
  3. Gas engine - Install coolant recovery container and overflow hose.
  4. Install upper radiator hose (3).
  5. Install engine cover.
  6. Connect the negative cable.
  7. Fill cooling system. Refer to STANDARD PROCEDURE .