Sensor, Knock: Removal: 4.0L
Courtesy of CHRYSLER LLC
- Perform the fuel system pressure relief procedure. Refer to FUEL DELIVERY, GAS [EKG, EGS], STANDARD PROCEDURE
.
- Disconnect and isolate the negative battery cable.
- Drain the cooling system. Refer to DRAINING COOLING SYSTEM
.
- Remove the upper intake manifold including EGR tube, PCV, purge and power brake booster vacuum hoses. Refer to MANIFOLD, INTAKE, REMOVAL
.
Courtesy of CHRYSLER LLC
- Remove fuel rail and lower intake manifold. Refer to LOWER INTAKE MANIFOLD
.
Courtesy of CHRYSLER LLC
- Remove sensor mounting bolt. Note foam strip on bolt threads. This foam is used only to retain the bolt to sensor for plant assembly. It is not used as a sealant. Do not apply any adhesive, sealant or thread locking compound to this bolt.
- Remove knock sensor (3) from engine.