LEMON Manuals: Even more car manuals for everyone
Home >> Dodge and Ram >> 2005 >> Durango 4.7 N, 4WD, Part Time >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Engine Cooling System & Automatic Transmission Cooling System >> Engine >> Radiator >> Installation

Engine Cooling System & Automatic Transmission Cooling System: Engine: Radiator: Installation

The radiator has two isolator pins on bottom of both tanks. These fit into alignment holes in radiator lower support.

  1. Install power steering cooler, if removed.
  2. Install transmission oil cooler if removed.
  3. Install the upper radiator mount
  4. Position isolator pins into alignment holes in radiator lower support.
  5. Install upper radiator support. Tighten bolts to 23 N.m (200 in. lbs.)
  6. Install LH and RH radiator side seals.
  7. Install upper radiator hose.
  8. Install overflow tube.
  9. Install radiator shroud.
  10. Raise vehicle.
  11. Install power steering cooler lines.
  12. Install transmission cooler lines.
  13. Install lower radiator hose.
  14. Lower vehicle.
  15. Install air filter housing assembly. Refer to appropriate Engine SERVICE INFORMATION article.
  16. Fill radiator (Refer to COOLING - STANDARD PROCEDURE) .
  17. Connect battery negative cable.
  18. Start and warm the engine. Check for leaks.